Generator services

Generator synchronisation assessed around the existing system

EMPS Electrical Power Solutions (Pty) Ltd can review generator synchronisation requirements from its Centurion base for suitable Gauteng commercial and industrial projects. Selected KwaZulu-Natal enquiries are considered individually because parallel operation depends on the generators, controls, protection and site distribution arrangement already in place.

Establish what parallel operation means on site

The first question is whether the project needs multiple generators to share load, coordinate with an existing supply, provide staged capacity or operate in another controlled sequence. Single-line diagrams, generator data, controller information and the intended operating modes are essential to an informed assessment.

Review controls and protection together

Synchronisation is not only a matter of matching voltage and frequency. The scope may involve synchronising controls, breakers, load-sharing logic, sensing, interlocks, protection settings, communications and the relationship with the site's distribution equipment. Compatibility is verified before a solution is proposed.

Plan testing around critical operations

Parallel-system testing can affect the site's power path and must be planned with the operator, responsible electrical personnel and safe switching procedures. The test sequence, fallback arrangement and conditions for returning to normal operation should be agreed before work begins.

Treat each synchronisation enquiry as a design assessment

Different generator makes, controllers and legacy installations can require different approaches. EMPS does not assume that every generator can be synchronised or that an existing panel is compatible; the requested scope is confirmed only after equipment and documentation have been reviewed.

What to expect

Information needed for a synchronisation assessment

Every site and generator is different. The final scope is confirmed after we understand the equipment, access conditions and work required.

  • Single-line diagram and generator or mains operating arrangement
  • Make, model, capacity and controller information for each generator
  • Whether the generators share load, provide standby stages or parallel with mains
  • Existing breaker, protection, sensing and communications details
  • Site operating window, critical loads and safe test procedure
  • Known alarms, unsuccessful synchronisation attempts or recent modifications
Project photographs

Project photographs

Photographs for this service will be added when suitable EMPS project images are available.

Service questions

Frequently asked questions

Can any two generators be synchronised?

No. Synchronisation depends on generator and alternator characteristics, controllers, breakers, protection, communications and the site arrangement. EMPS must assess compatibility and the intended operating mode before confirming a synchronisation scope.

Does synchronisation include load sharing?

Load sharing may be part of a suitable parallel-generation design, but it is not automatic in every synchronisation enquiry. The required control logic, measurements and protection must be reviewed against the equipment and project requirements.

Is a site assessment required for generator synchronisation?

A proper assessment usually needs drawings, controller information and site-specific electrical details, and may require a visit. The level of investigation depends on whether the system is new, existing, faulting or being modified.

Need help with generator synchronisation?

Share your location and equipment details so EMPS can scope the right next step.